Reconstruction

Our works before 2016

  • KDVVIZIG Érd pump house conversion: replacement of AGROFIL 500 pump with Flygt CP 3201 pump, NA 300,500 machinery installations. AGROFIL pump repair and renovation
  • Budakalász, CORA Hipermarket, new machinery installation of the existing sewage lift and gate valve, with replacement of the pressure line. (FLYGT pump replacement instead of ABS, connection of DN 90 KPE pressure line to DMRV RT. NA 300 KM-PVC pressure line)
DMRV RT. RECONSTRUCTIONS CARRIED OUT ON THE AREA:
  • Complete reconstruction of Pilisjászfalu potable water pressure boosting engine house with performance increase (machinery replacement for KO pipelines)
  • Reconstruction of Fót Regional waterworks engine house with complete DN300 machinery replacement pumps with increased performance
  • Leányfalu: machinery reconstruction of the 4.0m RL3 regional lift, locksmith-machinery reconstruction of the 2.5m RL2 regional lift
  • Tahitótfalu, locksmith and machinery reconstruction of the 2.5m RT3 regional lift, locksmith and machinery reconstruction of the 2.5m T5 central lift
  • Architectural (KESTON NKB coating) and machinery reconstruction of Göd No. 1 2.5m final transfer plant with increased performance
  • Szentendre – Határ Csárda 4.0m regional lift machinery reconstruction
  • Architectural and machinery renovation of Szob, central 2.5m lift (concrete shot + KESTON NKB coating)
  • Márianosztra III. no. Architectural (concrete shot + KESTON NKB coating) and machinery reconstruction of a 2.62m lift with increased performance
  • Visegrád Hospital, complete architectural (lining with etc. rings + KESTON NKB coating) and machinery reconstruction of a 2.5 m lift
  • Complete architectural and machinery reconstruction of the existing 2.50 m sewage lift in Pomáz with increased performance
  • Gödöllő, TESCO Store Mechanical reconstruction of the existing 1.60m lift with performance increase
  • Complete machinery reconstruction of the 1.60m overhead crane in Szentendre, Izbég I.sz. with increased performance
  • Szentendre, Izbég II, complete machinery reconstruction of the 1.60m overhead crane with increased performance
  • Complete architectural (KESTON NKB coating) and machinery reconstruction of the 3.0m final transfer station in Dunakeszi, I.sz. with increased performance
  • Fót, Béla Bartók u. complete architectural (ÜPE coating) and machinery reconstruction of the lifting plant with increased performance
  • Veresegyház V1. architectural and machinery reconstruction of lift no.
  • Veresegyház V29. architectural and machinery reconstruction of lift no.
PVCSV KFT. RECONSTRUCTIONS CARRIED OUT ON THE AREA:
  • Architectural (with plastic lining) and machinery renovation of Szigetszentmiklós  4.0m sewage end lift
  • Szigetszentmiklós-Lakihegy,  architectural and machinery renovation of the sewage lift in Híradó ui, construction of a fence from Betafance prefabricated fence elements with a 4.0m entrance gate
PAKSI VÍZMÜ KFT. RECONSTRUCTIONS CARRIED OUT ON THE AREA:
  • existing 2.0m price meter No. 3 machinery reconstruction of a sewage transfer shaft
  • existing 2.0m diameter No. 4 machinery reconstruction of a sewage transfer shaft
  • existing 2.0m diameter No. 5 architectural and machinery reconstruction of a sewage transfer shaft
  • existing 2.50m diameter No. 2 architectural (KESTON NKB) and machinery reconstruction of a public lift with increased performance
TÖKÖLI VİZMÜ KFT. RECONSTRUCTIONS CARRIED OUT ON THE AREA:
  • Mechanical reconstruction of 3 public overhead cranes
NYUGAT-NÓDRÁD VÍZMÜ KFT.
  •  Architectural (concrete shot + KESTON NKB coating) and machinery reconstruction of the Nagyorossi 2.0m end lift
RECONSTRUCTION WORKS CARRIED OUT AT OTHER WATER PLANT OPERATORS BETWEEN 2006-2012:
  • Architectural and machinery reconstruction of the Érd , Lé factory 2.0 m end lifter with increased performance
  • Budapest XXII. circ. Sodronyos u.  Complete architectural (KESTON NKB), machinery and electrical control engineering reconstruction of FCsM Rt. 2.0m lifting plant with performance increase
  • Budapest XVII. circ. Nemes u.  Complete architectural (KESTON NKB), machinery and electrical control engineering reconstruction of FCsM Rt. 2.50m pump station with performance increase
  • Ecser, Zrínyi u.  Reconstruction of the architecture and machinery engineering of a 2.0m end lifter with increased performance
  • Budakalász, Jókai u.  Mechanical reconstruction of a 1.40m intermediate lift
  • Budakalász, Tanító u.  Mechanical reconstruction of a 4.0m end lifter with increased performance
  • Kerepes  A/2. complete machinery reconstruction of dry-pit end hoist no
  • Gyömrő , Piaci Mechanical reconstruction of the existing 2.0m lift with increased performance
  • In Hajdúsámson , architectural (KESTON NKB coating) and machinery reconstruction of a 2.50m end lift with increased performance
  • Józsa , expansion of the 2.0m lifting plant, with a new measuring shaft and the installation of a Siemens MAGFLOW volume meter with increased performance
  • Ebes , complete architectural (KESTON NKB coating) and machinery reconstruction of the 3.0m end lift plant with increased performance
  • FCsM Zrt. , complete architectural and machinery reconstruction of 8 underground pump stations (sewage and rainwater lifters, swimming pools MC Ombran corrosion-resistant coating)
  • Keve-Víz Kft.  Architectural reconstruction of Dömsöd and Szigetbecse sewage end lift shafts, lining with HDPE claw plates.
  • Kerepes  A/2. Architectural reconstruction and machinery reconstruction of the draining, venting and regulating shafts on the D450 KPE pressure line of end lifter No.

You can check the authenticity of the above data with our customers and with the companies that operate and service the systems!