Keszthely, BR-2 new pump station pressure pipeline renovation

Customer: DRV Zrt

Description of the work: Replacement of the DN300/DN500 pipeline from the pump station to the measuring shaft with a new KO35Ti pressure pipe, including fittings, and the replacement of 2 drain-section wells DN500 with fittings to a new KO35Ti pressure pipe, with external material changes and vacuum well groundwater level lowering.

Time of construction: 2018-2019

The construction in pictures

Transfer documentation