Machinery reconstruction of the final lifting assembly shaft – Biatorbágy.

Customer: Fővárosi Vízművek Zrt.

Description of the work: Installation of a new DN250/300 KO Y-fitting with DN250 AVK fittings, external material change at the shaft, and installation of a new DN300 underground isolating gate valve with one DN300/150 T-fitting.

Time of construction: 2018

The construction in pictures

Transfer documentation.

The transfer documentation is prepared in PDF format, which you can view by clicking here.