Public procurement tenders

(Construction of regional sewage transfer systems)

  • Year 2001-2002 Ipolyvölgy and Térsége Wastewater Sewerage Project:
    (Ipolytölgyes, Letkés, Ipolydamásd, Márianosztra, Kóspallag and Szob settlements) complete architectural, machinery and electrical control construction of 14 sewage lifts.
  • 2002 Dunaföldvár and Térsége Wastewater Sewerage Project:
    (Dunaföldvár, Dunakömlőd, Bölcske and Madocsa settlements) Architectural and machinery construction of 10+5+3+4 sewage pump stations.
  • 2002 Monor and Térsége Sewerage Project:
    Complete construction of 6 lifting plants in Gomba settlement.
  • 2001-2002 Ráckeve and Térsége Wastewater Sewerage Project:
    (Ráckeve, Szigetbecse, Apaj, Dömsöd settlements) complete construction of public and regional lifting plants (architectural, machinery, electrical control, installation of active Biofilter deodorization equipment, site design for fence construction).
  • 2003-2004 Wastewater Sewerage Project of Nőtincs and its Area:
    (Nőtincs, Ősagárd, Alsópetény, Felsőpetény and Kárász) construction of 13 lifting units with complete architectural, machinery and active Biofilter deodorization equipment
  • Year 2003-2004 Iszkaszentgyörgy and Térsége Wastewater Sewerage Project:
    (Iszkaszentgyörgy, Moha, Sárkeresztes and Magyaralmás settlements) complete architectural, machinery, electrical control (with URH communication system) and plant layout of 15 lifting units.
  • Year 2004-2006 Budapest, XXII. circ. Csepel, Hollandi u. Wastewater sewerage Project:
    Complete construction of 3+2 FCSM Rt. sewage lifting plants.
  • 2005 Sewerage of Dánszentmiklós – Nyáregyháza settlements Project: Construction
    of 4+6 sewage lifting plants with complete architectural, machinery, electrical control technology (with communication system) and plant design.
  • Year 2007-2008 Romania – Marosvásárhely (Tirgu Mures) Wastewater Sewerage ISPA Project:
    Architectural and machinery reconstruction of 2 existing risers (1 4.0m and 1 2.50m in diameter) and construction of 3 newly built sewage risers.
  • Year 2007-2008 Zalaegerszeg and Térsége Wastewater Sewerage ISPA Project:
    complete architectural and machinery construction of 20 regional and 17 local sewage lifts.
  • 2008-2010 Debrecen and its surroundings Sewerage LOT4 Project:
    Complete architectural and machinery construction of 39 new sewage lifts and reconstruction of 2 existing sewage lifts.
  • Year 2009-2010 Adorjás and Térsége Sewage Sewerage ISPA Project:
    Complete architectural and machinery construction of 4 sewage lifts.
  • 2010 Kacsóta Wastewater Sewerage Project:
    Complete architectural and machinery construction of 1 sewage end lifter and machinery production and installation of sewage plant KO
  • Year 2010-2011 Debrecen and its Region Wastewater Sewerage LOT3 Project:
    Complete architectural and machinery construction of 8 new sewage lifts.
  • 2011 Bükkösd sewage system project:
    complete architectural and machinery construction of 5 new sewage lifts.
  • 2011 Nagydobsza and Kisdobsza sewage canalization project:
    complete architectural and machinery construction of 2+1 new sewage and purified water risers.
  • 2011-2012 year Veresegyház (Erdőkertes) – Szada sewage sewage project:
    complete architectural and machinery construction of 15 new sewage lifts.
  • 2011-2012 year Lajoskomárom – Dég sewage canalization project:
    complete architectural and machinery construction of 14 new sewage lifts.
  • 2012 Gádoros sewage canalization project:
    construction of 5 new sewage lifting plants.
  • 2012 Kelebia sewage sewage project:
    construction of 3 new sewage lifting plants.
  • Year 2012-2013 Nádudvar Hage Zrt. Construction of pig farms:
    architectural construction of 1 new 4.0m internal diameter collector lift and 2 discharge shafts
  • 2012-2013 year Balástya sewage system project:
    3 new sewage pumps, complete architectural, machinery, electrical control – with GSM/SMS control technology, with the installation of an active biofilter
  • Year 2012-2013 Tiszaföldvár-Homok district sewage sewerage project:
    complete architectural and machinery construction of 12 new sewage pumps with the installation of passive pipe biofilters and architectural and machinery renovation of 1 existing pump
  • 2012-2013 Maroslele sewage canalization project:
    7 new sewage pump stations with complete architectural, machinery, electrical control with URH control technology, with the installation of an active biofilter.
  • 2013-2014 Sewerage in Makó and its region (Makó, Apátfalva and Magyarcsanád settlements):
    complete architectural and machinery construction of 18 new sewage lifts with the installation of active biofilters
  • 2013 Wastewater sewerage project of Ópusztaszer:
    complete architectural and machinery construction of 5 new sewage lifts with the installation of passive pipe biofilters.
  • 2013-2014 Sewerage in SZEGVÁR:
    complete architectural and machinery construction of 9 new sewage lifts with the installation of active biofilters
  • 2014 Nádudvar sewage sewerage III. schedule:
    complete architectural and machinery construction of 7 new sewage pumps + machinery renovation of 2 existing pumps
  • 2014-2015 TÁPIÓSÁG LOT2 Wastewater sewerage and cleaning project (Farmos – Újszilvás and Tápiógyörgye settlements):
    complete architectural and machinery construction of 13 new sewage lifts with the installation of active biofilters
  • 2014-2015 Sewerage of Forráskút and its area (Bordány, Forráskút, Üllés and Zsombó settlements):
    complete architectural and machinery construction of 18 new sewage lifts with the installation of active biofilters
  • 2014-2015 BKISZ II. Sewage sewerage project (Bp. II. district József A. u.; Bp. III. district Bojtár u., Bp. XVII. district Sáránd u., Bp. XVIII. district Csévező és Bogrács u., Bp. XXIII .district Elvira – Házikert – Majori u.):
    construction of 8 new sewage pump stations with complete architectural, machinery, high-current electrical control and control technology, as well as the installation of active biofilters.
  • 2014-2015 Jánoshalma sewage system:
    complete architectural and machinery construction of 7 new sewage pump stations with the installation of passive pipe biofilters
  • 2015 Box sewage system:
    complete architectural and machinery construction of 9 new sewage lifts
  • 2015 Sewerage in Jászladány:
    complete architectural and machinery construction of 5 new sewage lifts with the installation of passive biofilters
  • 2015 Wastewater sewerage of the Hódmezővásárhely-Kishomok district:
    complete architectural and machinery construction of 2 new sewage lifts with the installation of active biofilters

You can check the authenticity of the above data with our customers and with the companies that operate and service the systems!